Then, pressing on the side push button triggers the pre-programmed welding impulse (the appropriate duration depends on the thickness and material of the pipe to be welded).
An indicator light warns the operator when the impulse is finished. The weld should then be allowed to cool under pressure for a further 2-3 seconds before the closed pipe is removed.